Red River Parish, Louisiana produced 15 Mbbl (thousand barrels) of oil and 519.4 Bcf of natural gas in 2025. 889 producing wells tracked, 12 months to May 2026.

  • Third-largest gas-producing parish in Louisiana, 2025.
  • 14.0% of the natural gas produced in Louisiana, 2025.
  • Natural gas production fell 7% in 2025 from 2024.
Well map of Red River Parish, Louisiana. The full map is further down this page.

Production

Red River Parish, Louisiana natural gas production (Bcf/d, grouped by when each well first produced)
  • filling in (est. · missed) . Hatching marks our estimate of the volume still to be filed. That estimate draws on our own production forecast. A check on the forecast behind this estimate measured a miss. It updates as filings arrive
Red River Parish, Louisiana natural gas production: billion cubic feet per day, by first-production vintage filed in full 0.511.52 Bcf/d 2017201820192020202120222023202420252026 Oct 2016: 0.56 Bcf/d total Nov 2016: 0.59 Bcf/d total Dec 2016: 0.56 Bcf/d total Jan 2017: 0.58 Bcf/d total Feb 2017: 0.6 Bcf/d total Mar 2017: 0.6 Bcf/d total Apr 2017: 0.57 Bcf/d total May 2017: 0.63 Bcf/d total Jun 2017: 0.69 Bcf/d total Jul 2017: 0.67 Bcf/d total Aug 2017: 0.76 Bcf/d total Sep 2017: 0.77 Bcf/d total Oct 2017: 0.83 Bcf/d total Nov 2017: 0.93 Bcf/d total Dec 2017: 0.97 Bcf/d total Jan 2018: 0.93 Bcf/d total Feb 2018: 1 Bcf/d total Mar 2018: 0.96 Bcf/d total Apr 2018: 0.98 Bcf/d total May 2018: 1 Bcf/d total Jun 2018: 1 Bcf/d total Jul 2018: 0.96 Bcf/d total Aug 2018: 0.97 Bcf/d total Sep 2018: 1.02 Bcf/d total Oct 2018: 1.06 Bcf/d total Nov 2018: 1.05 Bcf/d total Dec 2018: 0.99 Bcf/d total Jan 2019: 1.03 Bcf/d total Feb 2019: 1.06 Bcf/d total Mar 2019: 1.16 Bcf/d total Apr 2019: 1.19 Bcf/d total May 2019: 1.14 Bcf/d total Jun 2019: 1.09 Bcf/d total Jul 2019: 1.08 Bcf/d total Aug 2019: 1.06 Bcf/d total Sep 2019: 1.02 Bcf/d total Oct 2019: 1.03 Bcf/d total Nov 2019: 1.04 Bcf/d total Dec 2019: 1.08 Bcf/d total Jan 2020: 1.03 Bcf/d total Feb 2020: 1.09 Bcf/d total Mar 2020: 1.07 Bcf/d total Apr 2020: 1.11 Bcf/d total May 2020: 1.18 Bcf/d total Jun 2020: 1.13 Bcf/d total Jul 2020: 1.09 Bcf/d total Aug 2020: 1.02 Bcf/d total Sep 2020: 1.03 Bcf/d total Oct 2020: 0.98 Bcf/d total Nov 2020: 0.99 Bcf/d total Dec 2020: 1.13 Bcf/d total Jan 2021: 1.16 Bcf/d total Feb 2021: 1.02 Bcf/d total Mar 2021: 1.28 Bcf/d total Apr 2021: 1.35 Bcf/d total May 2021: 1.32 Bcf/d total Jun 2021: 1.3 Bcf/d total Jul 2021: 1.27 Bcf/d total Aug 2021: 1.22 Bcf/d total Sep 2021: 1.29 Bcf/d total Oct 2021: 1.21 Bcf/d total Nov 2021: 1.37 Bcf/d total Dec 2021: 1.48 Bcf/d total Jan 2022: 1.44 Bcf/d total Feb 2022: 1.44 Bcf/d total Mar 2022: 1.55 Bcf/d total Apr 2022: 1.56 Bcf/d total May 2022: 1.52 Bcf/d total Jun 2022: 1.47 Bcf/d total Jul 2022: 1.43 Bcf/d total Aug 2022: 1.37 Bcf/d total Sep 2022: 1.35 Bcf/d total Oct 2022: 1.28 Bcf/d total Nov 2022: 1.44 Bcf/d total Dec 2022: 1.4 Bcf/d total Jan 2023: 1.36 Bcf/d total Feb 2023: 1.42 Bcf/d total Mar 2023: 1.37 Bcf/d total Apr 2023: 1.47 Bcf/d total May 2023: 1.55 Bcf/d total Jun 2023: 1.56 Bcf/d total Jul 2023: 1.67 Bcf/d total Aug 2023: 1.76 Bcf/d total Sep 2023: 1.9 Bcf/d total Oct 2023: 1.86 Bcf/d total Nov 2023: 1.75 Bcf/d total Dec 2023: 1.67 Bcf/d total Jan 2024: 1.63 Bcf/d total Feb 2024: 1.76 Bcf/d total Mar 2024: 1.68 Bcf/d total Apr 2024: 1.55 Bcf/d total May 2024: 1.39 Bcf/d total Jun 2024: 1.47 Bcf/d total Jul 2024: 1.64 Bcf/d total Aug 2024: 1.58 Bcf/d total Sep 2024: 1.43 Bcf/d total Oct 2024: 1.39 Bcf/d total Nov 2024: 1.38 Bcf/d total Dec 2024: 1.35 Bcf/d total Jan 2025: 1.74 Bcf/d total Feb 2025: 1.47 Bcf/d total Mar 2025: 1.4 Bcf/d total Apr 2025: 1.31 Bcf/d total May 2025: 1.3 Bcf/d total Jun 2025: 1.46 Bcf/d total Jul 2025: 1.54 Bcf/d total Aug 2025: 1.51 Bcf/d total Sep 2025: 1.37 Bcf/d total Oct 2025: 1.3 Bcf/d total Nov 2025: 1.31 Bcf/d total Dec 2025: 1.35 Bcf/d total Jan 2026: 1.27 Bcf/d total Feb 2026: 1.5 Bcf/d total Mar 2026: 1.55 Bcf/d total Apr 2026: 1.61 Bcf/d total May 2026: 1.35 Bcf/d total Jun 2026: ≈1.53 Bcf/d total (65% arrived, remainder estimated) Jul 2026: ≈1.58 Bcf/d total (1% arrived, remainder estimated) Aug 2026: ≈1.57 Bcf/d total (<1% arrived, remainder estimated) Sep 2026: ≈1.57 Bcf/d total (<1% arrived, remainder estimated)

All from what the source published. All held at well grain.

How the volume breaks down
  • 69.8% Reported by the official source by well
  • 30.1% Reported by the official source as a lease total, split across the lease's wells. The regional total shown is the reported number, to rounding.
  • 0.17% A series adjusted so a total meets a published figure: a well's own cumulative from the official source, or a state's yearly total from a second official source.

Every cubic foot through May 2026 starts from what the official source published for those months. Measured over January 1977 to May 2026.

Red River Parish, Louisiana oil production (bbl/d, grouped by when each well first produced)
  • filling in (est. · missed) . Hatching marks our estimate of the volume still to be filed. That estimate draws on our own production forecast. A check on the forecast behind this estimate measured a miss. It updates as filings arrive
Red River Parish, Louisiana oil production: barrels per day, by first-production vintage filed in full 50100150 bbl/d 2017201820192020202120222023202420252026 Oct 2016: 120 bbl/d total Nov 2016: 115 bbl/d total Dec 2016: 131 bbl/d total Jan 2017: 101 bbl/d total Feb 2017: 126 bbl/d total Mar 2017: 117 bbl/d total Apr 2017: 109 bbl/d total May 2017: 99 bbl/d total Jun 2017: 101 bbl/d total Jul 2017: 137 bbl/d total Aug 2017: 116 bbl/d total Sep 2017: 93.3 bbl/d total Oct 2017: 117 bbl/d total Nov 2017: 118 bbl/d total Dec 2017: 115 bbl/d total Jan 2018: 105 bbl/d total Feb 2018: 115 bbl/d total Mar 2018: 90.6 bbl/d total Apr 2018: 106 bbl/d total May 2018: 104 bbl/d total Jun 2018: 122 bbl/d total Jul 2018: 110 bbl/d total Aug 2018: 114 bbl/d total Sep 2018: 115 bbl/d total Oct 2018: 113 bbl/d total Nov 2018: 106 bbl/d total Dec 2018: 106 bbl/d total Jan 2019: 114 bbl/d total Feb 2019: 96.1 bbl/d total Mar 2019: 88.9 bbl/d total Apr 2019: 82.9 bbl/d total May 2019: 71.2 bbl/d total Jun 2019: 84.7 bbl/d total Jul 2019: 89.5 bbl/d total Aug 2019: 74.7 bbl/d total Sep 2019: 63.5 bbl/d total Oct 2019: 64.6 bbl/d total Nov 2019: 61.9 bbl/d total Dec 2019: 62.4 bbl/d total Jan 2020: 62.1 bbl/d total Feb 2020: 67.2 bbl/d total Mar 2020: 66.4 bbl/d total Apr 2020: 69.8 bbl/d total May 2020: 40.1 bbl/d total Jun 2020: 66.2 bbl/d total Jul 2020: 39.1 bbl/d total Aug 2020: 47.8 bbl/d total Sep 2020: 74.3 bbl/d total Oct 2020: 68.4 bbl/d total Nov 2020: 59.4 bbl/d total Dec 2020: 69.1 bbl/d total Jan 2021: 63.3 bbl/d total Feb 2021: 56.3 bbl/d total Mar 2021: 72.5 bbl/d total Apr 2021: 62.1 bbl/d total May 2021: 61.4 bbl/d total Jun 2021: 64.2 bbl/d total Jul 2021: 63.8 bbl/d total Aug 2021: 68.9 bbl/d total Sep 2021: 64 bbl/d total Oct 2021: 53.5 bbl/d total Nov 2021: 63.2 bbl/d total Dec 2021: 60.9 bbl/d total Jan 2022: 56 bbl/d total Feb 2022: 50.8 bbl/d total Mar 2022: 55.5 bbl/d total Apr 2022: 37.2 bbl/d total May 2022: 56.8 bbl/d total Jun 2022: 47.1 bbl/d total Jul 2022: 46 bbl/d total Aug 2022: 44.7 bbl/d total Sep 2022: 60.8 bbl/d total Oct 2022: 58.2 bbl/d total Nov 2022: 57.2 bbl/d total Dec 2022: 36.1 bbl/d total Jan 2023: 57.3 bbl/d total Feb 2023: 60.6 bbl/d total Mar 2023: 59 bbl/d total Apr 2023: 49.5 bbl/d total May 2023: 47.1 bbl/d total Jun 2023: 55.3 bbl/d total Jul 2023: 47.5 bbl/d total Aug 2023: 54.1 bbl/d total Sep 2023: 37.9 bbl/d total Oct 2023: 58.6 bbl/d total Nov 2023: 59.2 bbl/d total Dec 2023: 54.8 bbl/d total Jan 2024: 38.9 bbl/d total Feb 2024: 60.9 bbl/d total Mar 2024: 40 bbl/d total Apr 2024: 54.2 bbl/d total May 2024: 48.6 bbl/d total Jun 2024: 53.5 bbl/d total Jul 2024: 40.7 bbl/d total Aug 2024: 53.1 bbl/d total Sep 2024: 35.4 bbl/d total Oct 2024: 37.5 bbl/d total Nov 2024: 29.4 bbl/d total Dec 2024: 42.5 bbl/d total Jan 2025: 29.9 bbl/d total Feb 2025: 38.6 bbl/d total Mar 2025: 29.3 bbl/d total Apr 2025: 37.9 bbl/d total May 2025: 52 bbl/d total Jun 2025: 42.9 bbl/d total Jul 2025: 29.4 bbl/d total Aug 2025: 35 bbl/d total Sep 2025: 43 bbl/d total Oct 2025: 53.3 bbl/d total Nov 2025: 53 bbl/d total Dec 2025: 51.2 bbl/d total Jan 2026: 35.5 bbl/d total Feb 2026: 50.1 bbl/d total Mar 2026: 41.3 bbl/d total Apr 2026: 60.3 bbl/d total May 2026: 55.8 bbl/d total Jun 2026: ≈59.2 bbl/d total (65% arrived, remainder estimated) Jul 2026: ≈60.2 bbl/d total (1% arrived, remainder estimated) Aug 2026: ≈60.5 bbl/d total (<1% arrived, remainder estimated) Sep 2026: ≈61.1 bbl/d total (<1% arrived, remainder estimated)

All from what the source published. All held at well grain.

How the volume breaks down
  • 12.3% Reported by the official source by well
  • 87.5% Reported by the official source as a lease total, split across the lease's wells. The regional total shown is the reported number, to rounding.
  • 0.17% A series adjusted so a total meets a published figure: a well's own cumulative from the official source, or a state's yearly total from a second official source.

Every barrel through May 2026 starts from what the official source published for those months. Measured over January 1977 to May 2026.

The bands group wells by when they first produced.

About this chart

The stack shows what is holding today's rate up and how much of it is new drilling. In the reported months the bands draw the filings already in. The months still filling in are marked.

Annual table (full history)

best estimate incl. allocated

YearOil (MMbbl)Gas produced (Bcf)
2025<0.1519
2024<0.1556
2023<0.1588
2022<0.1524
2021<0.1465
2020<0.1391
2019<0.1395
2018<0.1362
2017<0.1262
2016<0.1206
2015<0.1200
2014<0.1273
2013<0.1282
2012<0.1362
2011<0.1355
2010<0.1277
2009<0.186
2008<0.19
2007<0.12
2006<0.12
2005<0.12
2004<0.12
2003<0.12
2002<0.12
2001<0.12
2000<0.12
1999<0.12
1998<0.12
1997<0.12
1996<0.12
1995<0.12
1994<0.13
1993<0.14
19920.15
19910.16
19900.17
1989<0.16
1988<0.17
19870.16
19860.13
19850.22
19840.22
19830.33
19820.33
19810.42
19800.51
19790.62
19780.72
19770.93

Source: CommoVision (commovision.com)

Monthly table (last 24 months)
MonthOil (Mbbl)Gas produced (MMcf)
2026-051.741,909
2026-041.848,454
2026-031.348,195
2026-021.441,817
2026-011.139,260
2025-121.641,956
2025-111.639,432
2025-101.740,346
2025-091.341,048
2025-081.146,770
2025-070.947,650
2025-061.343,884
2025-051.640,353
2025-041.139,374
2025-030.943,382
2025-021.141,175
2025-010.954,016
2024-121.341,865
2024-110.941,314
2024-101.242,896
2024-091.142,848
2024-081.649,012
2024-071.350,842
2024-061.643,940

Source: CommoVision (commovision.com)

Source: CommoVision · Red River Parish, Louisiana, data through June 2026.

Well map

A map of 2,860 well locations in Red River Parish, Louisiana for which CommoVision holds a published surface coordinate, each drawn where it is and colored by its primary product (green for oil, red for natural gas, gray where undetermined; a spot shared by more than one product shows the one with the most wells there), on a ground of land and water over faint county outlines and place names for orientation, with the drilled wellbore path traced for 829 wells, with a small inset map locating this frame in Louisiana.
  • Oil 661
  • Natural gas 1,750
  • Undetermined 449
2,860 well locations in Red River Parish, Louisiana, colored by primary product. The drilled path is traced for 829 wells from the directional surveys we hold.
About this map

Undetermined means not enough signal to settle it. Producing wells are the ones that reported oil or gas in the 12 months to May 2026.

55.8 bbl/d May 2026 oil production +7.2% vs May last year best estimate incl. allocated
1.35 Bcf/d May 2026 gas production +3.9% vs May last year best estimate incl. allocated
41.3 bbl/d 2025 oil production
1.42 Bcf/d 2025 gas production best estimate incl. allocated
889 wells Producing wells tracked 12 months to May 2026

Type curves

Red River Parish, Louisiana natural gas type curves (Mcf/d per well, log scale, against months on production; cohorts 2010–2026)
Red River Parish, Louisiana natural gas type curves: average thousand cubic feet per day per well on a log scale against months on production 2010-2014: 372 wells; starts at 8,067 Mcf/d per well, 5.4 Bcf cumulative through month 141 (100% of its wells old enough at that month); the dashed curve runs through month 201, on our forecast where a well’s own record ends2015: 12 wells; starts at 13,026 Mcf/d per well, 7.1 Bcf cumulative through month 126 (100% of its wells old enough at that month); the dashed curve runs through month 186, on our forecast where a well’s own record ends2016: 28 wells; starts at 14,480 Mcf/d per well, 6.6 Bcf cumulative through month 115 (100% of its wells old enough at that month); the dashed curve runs through month 175, on our forecast where a well’s own record ends2017: 45 wells; starts at 14,869 Mcf/d per well, 7.8 Bcf cumulative through month 102 (100% of its wells old enough at that month); the dashed curve runs through month 162, on our forecast where a well’s own record ends2018: 37 wells; starts at 16,438 Mcf/d per well, 9.3 Bcf cumulative through month 91 (100% of its wells old enough at that month); the dashed curve runs through month 151, on our forecast where a well’s own record ends2019: 39 wells; starts at 16,885 Mcf/d per well, 11.5 Bcf cumulative through month 78 (100% of its wells old enough at that month); the dashed curve runs through month 138, on our forecast where a well’s own record ends2020: 28 wells; starts at 13,343 Mcf/d per well, 10.4 Bcf cumulative through month 66 (100% of its wells old enough at that month); the dashed curve runs through month 126, on our forecast where a well’s own record ends2021: 44 wells; starts at 20,567 Mcf/d per well, 11.2 Bcf cumulative through month 54 (100% of its wells old enough at that month); the dashed curve runs through month 114, on our forecast where a well’s own record ends2022: 39 wells; starts at 24,576 Mcf/d per well, 11.0 Bcf cumulative through month 42 (100% of its wells old enough at that month); the dashed curve runs through month 102, on our forecast where a well’s own record ends2023: 57 wells; starts at 19,313 Mcf/d per well, 9.9 Bcf cumulative through month 30 (100% of its wells old enough at that month); the dashed curve runs through month 90, on our forecast where a well’s own record ends2024: 30 wells; starts at 25,366 Mcf/d per well, 9.8 Bcf cumulative through month 18 (100% of its wells old enough at that month); the dashed curve runs through month 78, on our forecast where a well’s own record ends2025: 28 wells; starts at 17,812 Mcf/d per well, 4.1 Bcf cumulative through month 6 (100% of its wells old enough at that month); the dashed curve runs through month 66, on our forecast where a well’s own record ends2026: 13 wells; starts at 28,381 Mcf/d per well, 1.9 Bcf cumulative through month 2 (100% of its wells old enough at that month); the dashed curve runs through month 62, on our forecast where a well’s own record ends301001,00010,00040,000Mcf/d24487296120144168192216Months on production
Red River Parish, Louisiana oil type curves (bbl/d per well, log scale, against months on production; cohorts 2010–2014)
Red River Parish, Louisiana oil type curves: average barrels per day per well on a log scale against months on production 2010-2014: 372 wells; starts at 0.1 bbl/d per well, 0.0 Mbbl cumulative through month 55 (100% of its wells old enough at that month)0.030.050.10.20.3bbl/d1224364860Months on production

best estimate incl. allocated

Horizontal wells only. Average production per well, for wells grouped by when they first produced.

How these curves are built

Horizontal wells only: 772 of the 782 wells in these cohorts. Average daily production per well, for wells grouped by when they first produced. Includes every well of the cohort that is old enough at each month. Wells that are shut in or have stopped producing count as zero, so the average reflects the full cohort, not just survivors. Rates are calendar-day (volume ÷ days in month). The cumulative axis accumulates those same monthly averages at the average month length. Months not yet fully reported are excluded. The 2010-2014 curve draws those years as one group. The chart opens on average daily rate against months on production, the rate on a log scale. The view control switches to rate against cumulative production per well, on the same log rate scale, or to cumulative production per well against months on production, on a linear scale. Every view draws the same cohorts from the same production history. Each cohort with a dashed curve is solid through the last month all of its wells sit inside fully reported data. Past it the dashed curve carries the same wells forward, on our forecast where a well’s own record ends, for up to five years. A dashed curve runs as far as at least nine in ten of its wells are accounted for. A cohort with no dashed curve is drawn only through the months where at least 30% of its wells are old enough for the month to be fully reported. A well that is old enough but shut in still counts, as zero. The measured months are what these wells reported. In the forward months each well counts its own reported figure for each month it has one, our forecast for each month it has only that, and zero for the rest. The forward average counts every well of the cohort. The drawn forecast runs up to five years past the measured months. Line thickness tracks how many wells each curve is drawn from.

Cohort summary table
First produced Wells Peak oil (bbl/d per well) Month-12 oil (bbl/d per well) Cum oil in series (Mbbl per well) Peak gas (Mcf/d per well) Month-12 gas (Mcf/d per well) Cum gas in series (Bcf per well) Months in series Wells old enough at last month in series Forecast months drawn
2026 13 0 0.0 34,308 1.9 5 46% 60
2025 28 0 0 0.0 25,621 4.1 16 36% 60
2024 30 0 0 0.0 25,678 18,246 9.8 28 47% 60
2023 57 0 0 0.0 25,576 12,394 9.9 38 35% 60
2022 39 0 0 0.0 25,611 10,790 11.0 50 36% 60
2021 44 0 0 0.0 24,292 12,704 11.2 62 52% 60
2020 28 0 0 0.0 15,104 12,838 10.4 75 32% 60
2019 39 0 0 0.0 18,504 11,707 11.5 87 41% 60
2018 37 0 0 0.0 17,024 9,194 9.3 98 35% 60
2017 45 0 0 0.0 14,869 7,774 7.8 108 33% 60
2016 28 0 0 0.0 14,480 6,669 6.6 121 39% 60
2015 12 0 0 0.0 13,026 5,026 7.1 134 42% 60
2010-2014 372 0.1 0 0.0 10,004 3,954 5.4 189 31% 60

Source: CommoVision (commovision.com)

Source: CommoVision · Red River Parish, Louisiana type curves, per-well production by first-production cohort.

Top operators in Red River Parish, Louisiana, 2025 best estimate incl. allocated

  1. Expand Energy 61.8%
  2. BP 17.7%
  3. Aethon Energy 16.7%
  4. Comstock Resources 2.1%
  5. Quantent Energy Partners Operating LLC 0.9%
  6. Apex Natural Gas 0.3%
  7. GEP Haynesville II 0.2%
  8. Paloma Partners 0.1%
  9. BCF Operating, LLC 0.0%
  10. Pedernales Petroleum Operating, LLC 0.0%
  11. 10 other operators 0.1%
Top operators in Red River Parish, Louisiana, 2025: full table
OperatorOil (Mbbl/d, 2025)Gas produced (MMcf/d, 2025)Share of output
Expand Energy 0.0880.461.8%
BP 0.0252.017.7%
Aethon Energy 0.0237.716.7%
Comstock Resources 0.030.02.1%
Quantent Energy Partners Operating LLC 0.012.70.9%
Apex Natural Gas (April to December) 0.05.10.3%
GEP Haynesville II (December) 0.035.80.2%
Paloma Partners (January to March) 0.07.30.1%
BCF Operating, LLC 0.00.30.0%
Pedernales Petroleum Operating, LLC 0.00.40.0%
10 other operators 0.00.70.1%

Mbbl/d = thousand barrels per day · MMcf/d = million cubic feet per day (units).

Source: CommoVision (commovision.com)

Active drilling rigs

3 rigs active in the week to September 11, 2026
±0 rigs vs the same week a year earlier
11 rigs peak week, Feb 2023 (since Sep 2016)
Active drilling rigs by rig type (rigs, weekly count)Source: Baker Hughes rig count
Gas
Active drilling rigs by rig type: rigs, weekly count 5 10 15 rigs 2017201820192020202120222023202420252026 Week to Sep 16, 2016: 2 rigs total (Gas 2) Week to Sep 23, 2016: 2 rigs total (Gas 2) Week to Sep 30, 2016: 2 rigs total (Gas 2) Week to Oct 7, 2016: 3 rigs total (Gas 3) Week to Oct 14, 2016: 5 rigs total (Gas 5) Week to Oct 21, 2016: 4 rigs total (Gas 4) Week to Oct 28, 2016: 4 rigs total (Gas 4) Week to Nov 4, 2016: 4 rigs total (Gas 4) Week to Nov 11, 2016: 4 rigs total (Gas 4) Week to Nov 18, 2016: 4 rigs total (Gas 4) Week to Nov 23, 2016: 4 rigs total (Gas 4) Week to Dec 2, 2016: 4 rigs total (Gas 4) Week to Dec 9, 2016: 3 rigs total (Gas 3) Week to Dec 16, 2016: 3 rigs total (Gas 3) Week to Dec 23, 2016: 3 rigs total (Gas 3) Week to Dec 30, 2016: 3 rigs total (Gas 3) Week to Jan 6, 2017: 3 rigs total (Gas 3) Week to Jan 13, 2017: 2 rigs total (Gas 2) Week to Jan 20, 2017: 2 rigs total (Gas 2) Week to Jan 27, 2017: 5 rigs total (Gas 5) Week to Feb 3, 2017: 5 rigs total (Gas 5) Week to Feb 10, 2017: 5 rigs total (Gas 5) Week to Feb 17, 2017: 5 rigs total (Gas 5) Week to Feb 24, 2017: 5 rigs total (Gas 5) Week to Mar 3, 2017: 5 rigs total (Gas 5) Week to Mar 10, 2017: 5 rigs total (Gas 5) Week to Mar 17, 2017: 5 rigs total (Gas 5) Week to Mar 24, 2017: 5 rigs total (Gas 5) Week to Mar 31, 2017: 5 rigs total (Gas 5) Week to Apr 7, 2017: 5 rigs total (Gas 5) Week to Apr 13, 2017: 6 rigs total (Gas 6) Week to Apr 21, 2017: 6 rigs total (Gas 6) Week to Apr 28, 2017: 6 rigs total (Gas 6) Week to May 5, 2017: 6 rigs total (Gas 6) Week to May 12, 2017: 8 rigs total (Gas 8) Week to May 19, 2017: 9 rigs total (Gas 9) Week to May 26, 2017: 9 rigs total (Gas 9) Week to Jun 2, 2017: 10 rigs total (Gas 10) Week to Jun 9, 2017: 10 rigs total (Gas 10) Week to Jun 16, 2017: 10 rigs total (Gas 10) Week to Jun 23, 2017: 10 rigs total (Gas 10) Week to Jun 30, 2017: 10 rigs total (Gas 10) Week to Jul 7, 2017: 10 rigs total (Gas 10) Week to Jul 14, 2017: 9 rigs total (Gas 9) Week to Jul 21, 2017: 9 rigs total (Gas 9) Week to Jul 28, 2017: 9 rigs total (Gas 9) Week to Aug 4, 2017: 9 rigs total (Gas 9) Week to Aug 11, 2017: 9 rigs total (Gas 9) Week to Aug 18, 2017: 9 rigs total (Gas 9) Week to Aug 25, 2017: 9 rigs total (Gas 9) Week to Sep 1, 2017: 7 rigs total (Gas 7) Week to Sep 8, 2017: 7 rigs total (Gas 7) Week to Sep 15, 2017: 6 rigs total (Gas 6) Week to Sep 22, 2017: 5 rigs total (Gas 5) Week to Sep 29, 2017: 3 rigs total (Gas 3) Week to Oct 6, 2017: 3 rigs total (Gas 3) Week to Oct 13, 2017: 3 rigs total (Gas 3) Week to Oct 20, 2017: 3 rigs total (Gas 3) Week to Oct 27, 2017: 3 rigs total (Gas 3) Week to Nov 3, 2017: 3 rigs total (Gas 3) Week to Nov 10, 2017: 3 rigs total (Gas 3) Week to Nov 17, 2017: 3 rigs total (Gas 3) Week to Nov 22, 2017: 3 rigs total (Gas 3) Week to Dec 1, 2017: 3 rigs total (Gas 3) Week to Dec 8, 2017: 3 rigs total (Gas 3) Week to Dec 15, 2017: 3 rigs total (Gas 3) Week to Dec 22, 2017: 3 rigs total (Gas 3) Week to Dec 29, 2017: 3 rigs total (Gas 3) Week to Jan 5, 2018: 3 rigs total (Gas 3) Week to Jan 12, 2018: 3 rigs total (Gas 3) Week to Jan 19, 2018: 3 rigs total (Gas 3) Week to Jan 26, 2018: 3 rigs total (Gas 3) Week to Feb 2, 2018: 3 rigs total (Gas 3) Week to Feb 9, 2018: 5 rigs total (Gas 5) Week to Feb 16, 2018: 4 rigs total (Gas 4) Week to Feb 23, 2018: 5 rigs total (Gas 5) Week to Mar 2, 2018: 7 rigs total (Gas 7) Week to Mar 9, 2018: 7 rigs total (Gas 7) Week to Mar 16, 2018: 7 rigs total (Gas 7) Week to Mar 23, 2018: 7 rigs total (Gas 7) Week to Mar 29, 2018: 7 rigs total (Gas 7) Week to Apr 6, 2018: 7 rigs total (Gas 7) Week to Apr 13, 2018: 5 rigs total (Gas 5) Week to Apr 20, 2018: 5 rigs total (Gas 5) Week to Apr 27, 2018: 4 rigs total (Gas 4) Week to May 4, 2018: 5 rigs total (Gas 5) Week to May 11, 2018: 5 rigs total (Gas 5) Week to May 18, 2018: 5 rigs total (Gas 5) Week to May 25, 2018: 5 rigs total (Gas 5) Week to Jun 1, 2018: 5 rigs total (Gas 5) Week to Jun 8, 2018: 4 rigs total (Gas 4) Week to Jun 15, 2018: 4 rigs total (Gas 4) Week to Jun 22, 2018: 3 rigs total (Gas 3) Week to Jun 29, 2018: 2 rigs total (Gas 2) Week to Jul 6, 2018: 2 rigs total (Gas 2) Week to Jul 13, 2018: 3 rigs total (Gas 3) Week to Jul 20, 2018: 3 rigs total (Gas 3) Week to Jul 27, 2018: 5 rigs total (Gas 5) Week to Aug 3, 2018: 6 rigs total (Gas 6) Week to Aug 10, 2018: 4 rigs total (Gas 4) Week to Aug 17, 2018: 4 rigs total (Gas 4) Week to Aug 24, 2018: 4 rigs total (Gas 4) Week to Aug 31, 2018: 4 rigs total (Gas 4) Week to Sep 7, 2018: 4 rigs total (Gas 4) Week to Sep 14, 2018: 4 rigs total (Gas 4) Week to Sep 21, 2018: 4 rigs total (Gas 4) Week to Sep 28, 2018: 4 rigs total (Gas 4) Week to Oct 5, 2018: 4 rigs total (Gas 4) Week to Oct 12, 2018: 4 rigs total (Gas 4) Week to Oct 19, 2018: 4 rigs total (Gas 4) Week to Oct 26, 2018: 5 rigs total (Gas 5) Week to Nov 2, 2018: 5 rigs total (Gas 5) Week to Nov 9, 2018: 5 rigs total (Gas 5) Week to Nov 16, 2018: 5 rigs total (Gas 5) Week to Nov 21, 2018: 5 rigs total (Gas 5) Week to Nov 30, 2018: 5 rigs total (Gas 5) Week to Dec 7, 2018: 7 rigs total (Gas 7) Week to Dec 14, 2018: 7 rigs total (Gas 7) Week to Dec 21, 2018: 7 rigs total (Gas 7) Week to Dec 28, 2018: 6 rigs total (Gas 6) Week to Jan 4, 2019: 6 rigs total (Gas 6) Week to Jan 11, 2019: 6 rigs total (Gas 6) Week to Jan 18, 2019: 7 rigs total (Gas 7) Week to Jan 25, 2019: 7 rigs total (Gas 7) Week to Feb 1, 2019: 6 rigs total (Gas 6) Week to Feb 8, 2019: 5 rigs total (Gas 5) Week to Feb 15, 2019: 5 rigs total (Gas 5) Week to Feb 22, 2019: 5 rigs total (Gas 5) Week to Mar 1, 2019: 4 rigs total (Gas 4) Week to Mar 8, 2019: 5 rigs total (Gas 5) Week to Mar 15, 2019: 5 rigs total (Gas 5) Week to Mar 22, 2019: 5 rigs total (Gas 5) Week to Mar 29, 2019: 5 rigs total (Gas 5) Week to Apr 5, 2019: 5 rigs total (Gas 5) Week to Apr 12, 2019: 5 rigs total (Gas 5) Week to Apr 18, 2019: 4 rigs total (Gas 4) Week to Apr 26, 2019: 5 rigs total (Gas 5) Week to May 3, 2019: 4 rigs total (Gas 4) Week to May 10, 2019: 3 rigs total (Gas 3) Week to May 17, 2019: 3 rigs total (Gas 3) Week to May 24, 2019: 3 rigs total (Gas 3) Week to May 31, 2019: 3 rigs total (Gas 3) Week to Jun 7, 2019: 3 rigs total (Gas 3) Week to Jun 14, 2019: 3 rigs total (Gas 3) Week to Jun 21, 2019: 2 rigs total (Gas 2) Week to Jun 28, 2019: 2 rigs total (Gas 2) Week to Jul 3, 2019: 2 rigs total (Gas 2) Week to Jul 12, 2019: 2 rigs total (Gas 2) Week to Jul 19, 2019: 2 rigs total (Gas 2) Week to Jul 26, 2019: 2 rigs total (Gas 2) Week to Aug 2, 2019: 2 rigs total (Gas 2) Week to Aug 9, 2019: 3 rigs total (Gas 3) Week to Aug 16, 2019: 3 rigs total (Gas 3) Week to Aug 23, 2019: 4 rigs total (Gas 4) Week to Aug 30, 2019: 4 rigs total (Gas 4) Week to Sep 6, 2019: 4 rigs total (Gas 4) Week to Sep 13, 2019: 4 rigs total (Gas 4) Week to Sep 20, 2019: 4 rigs total (Gas 4) Week to Sep 27, 2019: 5 rigs total (Gas 5) Week to Oct 4, 2019: 5 rigs total (Gas 5) Week to Oct 11, 2019: 4 rigs total (Gas 4) Week to Oct 18, 2019: 4 rigs total (Gas 4) Week to Oct 25, 2019: 4 rigs total (Gas 4) Week to Nov 1, 2019: 4 rigs total (Gas 4) Week to Nov 8, 2019: 4 rigs total (Gas 4) Week to Nov 15, 2019: 4 rigs total (Gas 4) Week to Nov 22, 2019: 5 rigs total (Gas 5) Week to Nov 27, 2019: 5 rigs total (Gas 5) Week to Dec 6, 2019: 5 rigs total (Gas 5) Week to Dec 13, 2019: 7 rigs total (Gas 7) Week to Dec 20, 2019: 7 rigs total (Gas 7) Week to Dec 27, 2019: 7 rigs total (Gas 7) Week to Jan 3, 2020: 7 rigs total (Gas 7) Week to Jan 10, 2020: 7 rigs total (Gas 7) Week to Jan 17, 2020: 6 rigs total (Gas 6) Week to Jan 24, 2020: 6 rigs total (Gas 6) Week to Jan 31, 2020: 6 rigs total (Gas 6) Week to Feb 7, 2020: 6 rigs total (Gas 6) Week to Feb 14, 2020: 4 rigs total (Gas 4) Week to Feb 21, 2020: 2 rigs total (Gas 2) Week to Feb 28, 2020: 1 rig total (Gas 1) Week to Mar 6, 2020: 1 rig total (Gas 1) Week to Mar 13, 2020: 1 rig total (Gas 1) Week to Mar 20, 2020: 1 rig total (Gas 1) Week to Mar 27, 2020: 1 rig total (Gas 1) Week to Apr 3, 2020: 1 rig total (Gas 1) Week to Apr 9, 2020: 1 rig total (Gas 1) Week to Apr 17, 2020: 1 rig total (Gas 1) Week to Apr 24, 2020: 1 rig total (Gas 1) Week to May 1, 2020: 1 rig total (Gas 1) Week to May 8, 2020: 1 rig total (Gas 1) Week to May 15, 2020: 1 rig total (Gas 1) Week to May 22, 2020: 1 rig total (Gas 1) Week to May 29, 2020: 1 rig total (Gas 1) Week to Jun 5, 2020: 1 rig total (Gas 1) Week to Jun 12, 2020: 1 rig total (Gas 1) Week to Jun 19, 2020: 2 rigs total (Gas 2) Week to Jun 26, 2020: 2 rigs total (Gas 2) Week to Jul 2, 2020: 3 rigs total (Gas 3) Week to Jul 10, 2020: 4 rigs total (Gas 4) Week to Jul 17, 2020: 4 rigs total (Gas 4) Week to Jul 24, 2020: 4 rigs total (Gas 4) Week to Jul 31, 2020: 5 rigs total (Gas 5) Week to Aug 7, 2020: 5 rigs total (Gas 5) Week to Aug 14, 2020: 5 rigs total (Gas 5) Week to Aug 21, 2020: 5 rigs total (Gas 5) Week to Aug 28, 2020: 5 rigs total (Gas 5) Week to Sep 4, 2020: 5 rigs total (Gas 5) Week to Sep 11, 2020: 5 rigs total (Gas 5) Week to Sep 18, 2020: 5 rigs total (Gas 5) Week to Sep 25, 2020: 5 rigs total (Gas 5) Week to Oct 2, 2020: 6 rigs total (Gas 6) Week to Oct 9, 2020: 6 rigs total (Gas 6) Week to Oct 16, 2020: 5 rigs total (Gas 5) Week to Oct 23, 2020: 5 rigs total (Gas 5) Week to Oct 30, 2020: 3 rigs total (Gas 3) Week to Nov 6, 2020: 3 rigs total (Gas 3) Week to Nov 13, 2020: 3 rigs total (Gas 3) Week to Nov 20, 2020: 3 rigs total (Gas 3) Week to Nov 25, 2020: 3 rigs total (Gas 3) Week to Dec 4, 2020: 3 rigs total (Gas 3) Week to Dec 11, 2020: 1 rig total (Gas 1) Week to Dec 18, 2020: 1 rig total (Gas 1) Week to Dec 23, 2020: 1 rig total (Gas 1) Week to Dec 31, 2020: 1 rig total (Gas 1) Week to Jan 8, 2021: 1 rig total (Gas 1) Week to Jan 15, 2021: 2 rigs total (Gas 2) Week to Jan 22, 2021: 3 rigs total (Gas 3) Week to Jan 29, 2021: 3 rigs total (Gas 3) Week to Feb 5, 2021: 3 rigs total (Gas 3) Week to Feb 12, 2021: 2 rigs total (Gas 2) Week to Feb 19, 2021: 2 rigs total (Gas 2) Week to Feb 26, 2021: 2 rigs total (Gas 2) Week to Mar 5, 2021: 2 rigs total (Gas 2) Week to Mar 12, 2021: 3 rigs total (Gas 3) Week to Mar 19, 2021: 4 rigs total (Gas 4) Week to Mar 26, 2021: 4 rigs total (Gas 4) Week to Apr 1, 2021: 4 rigs total (Gas 4) Week to Apr 9, 2021: 4 rigs total (Gas 4) Week to Apr 16, 2021: 4 rigs total (Gas 4) Week to Apr 23, 2021: 4 rigs total (Gas 4) Week to Apr 30, 2021: 4 rigs total (Gas 4) Week to May 7, 2021: 3 rigs total (Gas 3) Week to May 14, 2021: 3 rigs total (Gas 3) Week to May 21, 2021: 3 rigs total (Gas 3) Week to May 28, 2021: 3 rigs total (Gas 3) Week to Jun 4, 2021: 4 rigs total (Gas 4) Week to Jun 11, 2021: 4 rigs total (Gas 4) Week to Jun 18, 2021: 4 rigs total (Gas 4) Week to Jun 25, 2021: 5 rigs total (Gas 5) Week to Jul 2, 2021: 6 rigs total (Gas 6) Week to Jul 9, 2021: 6 rigs total (Gas 6) Week to Jul 16, 2021: 3 rigs total (Gas 3) Week to Jul 23, 2021: 3 rigs total (Gas 3) Week to Jul 30, 2021: 3 rigs total (Gas 3) Week to Aug 6, 2021: 3 rigs total (Gas 3) Week to Aug 13, 2021: 3 rigs total (Gas 3) Week to Aug 20, 2021: 4 rigs total (Gas 4) Week to Aug 27, 2021: 4 rigs total (Gas 4) Week to Sep 3, 2021: 4 rigs total (Gas 4) Week to Sep 10, 2021: 4 rigs total (Gas 4) Week to Sep 17, 2021: 4 rigs total (Gas 4) Week to Sep 24, 2021: 4 rigs total (Gas 4) Week to Oct 1, 2021: 4 rigs total (Gas 4) Week to Oct 8, 2021: 5 rigs total (Gas 5) Week to Oct 15, 2021: 7 rigs total (Gas 7) Week to Oct 22, 2021: 7 rigs total (Gas 7) Week to Oct 29, 2021: 7 rigs total (Gas 7) Week to Nov 5, 2021: 8 rigs total (Gas 8) Week to Nov 12, 2021: 8 rigs total (Gas 8) Week to Nov 19, 2021: 8 rigs total (Gas 8) Week to Nov 24, 2021: 9 rigs total (Gas 9) Week to Dec 3, 2021: 9 rigs total (Gas 9) Week to Dec 10, 2021: 9 rigs total (Gas 9) Week to Dec 17, 2021: 9 rigs total (Gas 9) Week to Dec 23, 2021: 8 rigs total (Gas 8) Week to Dec 31, 2021: 8 rigs total (Gas 8) Week to Jan 7, 2022: 8 rigs total (Gas 8) Week to Jan 14, 2022: 7 rigs total (Gas 7) Week to Jan 21, 2022: 6 rigs total (Gas 6) Week to Jan 28, 2022: 5 rigs total (Gas 5) Week to Feb 4, 2022: 5 rigs total (Gas 5) Week to Feb 11, 2022: 5 rigs total (Gas 5) Week to Feb 18, 2022: 2 rigs total (Gas 2) Week to Feb 25, 2022: 4 rigs total (Gas 4) Week to Mar 4, 2022: 4 rigs total (Gas 4) Week to Mar 11, 2022: 4 rigs total (Gas 4) Week to Mar 18, 2022: 4 rigs total (Gas 4) Week to Mar 25, 2022: 4 rigs total (Gas 4) Week to Apr 1, 2022: 4 rigs total (Gas 4) Week to Apr 8, 2022: 3 rigs total (Gas 3) Week to Apr 14, 2022: 3 rigs total (Gas 3) Week to Apr 22, 2022: 3 rigs total (Gas 3) Week to Apr 29, 2022: 3 rigs total (Gas 3) Week to May 6, 2022: 4 rigs total (Gas 4) Week to May 13, 2022: 4 rigs total (Gas 4) Week to May 20, 2022: 6 rigs total (Gas 6) Week to May 27, 2022: 5 rigs total (Gas 5) Week to Jun 3, 2022: 5 rigs total (Gas 5) Week to Jun 10, 2022: 5 rigs total (Gas 5) Week to Jun 17, 2022: 5 rigs total (Gas 5) Week to Jun 24, 2022: 5 rigs total (Gas 5) Week to Jul 1, 2022: 4 rigs total (Gas 4) Week to Jul 8, 2022: 4 rigs total (Gas 4) Week to Jul 15, 2022: 4 rigs total (Gas 4) Week to Jul 22, 2022: 4 rigs total (Gas 4) Week to Jul 29, 2022: 4 rigs total (Gas 4) Week to Aug 5, 2022: 4 rigs total (Gas 4) Week to Aug 12, 2022: 4 rigs total (Gas 4) Week to Aug 19, 2022: 4 rigs total (Gas 4) Week to Aug 26, 2022: 5 rigs total (Gas 5) Week to Sep 2, 2022: 5 rigs total (Gas 5) Week to Sep 9, 2022: 8 rigs total (Gas 8) Week to Sep 16, 2022: 8 rigs total (Gas 8) Week to Sep 23, 2022: 8 rigs total (Gas 8) Week to Sep 30, 2022: 8 rigs total (Gas 8) Week to Oct 7, 2022: 8 rigs total (Gas 8) Week to Oct 14, 2022: 8 rigs total (Gas 8) Week to Oct 21, 2022: 8 rigs total (Gas 8) Week to Oct 28, 2022: 7 rigs total (Gas 7) Week to Nov 4, 2022: 8 rigs total (Gas 8) Week to Nov 10, 2022: 8 rigs total (Gas 8) Week to Nov 18, 2022: 8 rigs total (Gas 8) Week to Nov 23, 2022: 8 rigs total (Gas 8) Week to Dec 2, 2022: 8 rigs total (Gas 8) Week to Dec 9, 2022: 7 rigs total (Gas 7) Week to Dec 16, 2022: 9 rigs total (Gas 9) Week to Dec 22, 2022: 9 rigs total (Gas 9) Week to Dec 30, 2022: 9 rigs total (Gas 9) Week to Jan 6, 2023: 8 rigs total (Gas 8) Week to Jan 13, 2023: 7 rigs total (Gas 7) Week to Jan 20, 2023: 10 rigs total (Gas 10) Week to Jan 27, 2023: 10 rigs total (Gas 10) Week to Feb 3, 2023: 10 rigs total (Gas 10) Week to Feb 10, 2023: 11 rigs total (Gas 11) Week to Feb 17, 2023: 11 rigs total (Gas 11) Week to Feb 24, 2023: 11 rigs total (Gas 11) Week to Mar 3, 2023: 10 rigs total (Gas 10) Week to Mar 10, 2023: 8 rigs total (Gas 8) Week to Mar 17, 2023: 9 rigs total (Gas 9) Week to Mar 24, 2023: 9 rigs total (Gas 9) Week to Mar 31, 2023: 9 rigs total (Gas 9) Week to Apr 6, 2023: 9 rigs total (Gas 9) Week to Apr 14, 2023: 9 rigs total (Gas 9) Week to Apr 21, 2023: 8 rigs total (Gas 8) Week to Apr 28, 2023: 8 rigs total (Gas 8) Week to May 5, 2023: 8 rigs total (Gas 8) Week to May 12, 2023: 9 rigs total (Gas 9) Week to May 19, 2023: 9 rigs total (Gas 9) Week to May 26, 2023: 9 rigs total (Gas 9) Week to Jun 2, 2023: 8 rigs total (Gas 8) Week to Jun 9, 2023: 8 rigs total (Gas 8) Week to Jun 16, 2023: 8 rigs total (Gas 8) Week to Jun 23, 2023: 8 rigs total (Gas 8) Week to Jun 30, 2023: 6 rigs total (Gas 6) Week to Jul 7, 2023: 6 rigs total (Gas 6) Week to Jul 14, 2023: 6 rigs total (Gas 6) Week to Jul 21, 2023: 6 rigs total (Gas 6) Week to Jul 28, 2023: 6 rigs total (Gas 6) Week to Aug 4, 2023: 6 rigs total (Gas 6) Week to Aug 11, 2023: 7 rigs total (Gas 7) Week to Aug 18, 2023: 6 rigs total (Gas 6) Week to Aug 25, 2023: 4 rigs total (Gas 4) Week to Sep 1, 2023: 5 rigs total (Gas 5) Week to Sep 8, 2023: 5 rigs total (Gas 5) Week to Sep 15, 2023: 5 rigs total (Gas 5) Week to Sep 22, 2023: 5 rigs total (Gas 5) Week to Sep 29, 2023: 5 rigs total (Gas 5) Week to Oct 6, 2023: 5 rigs total (Gas 5) Week to Oct 13, 2023: 6 rigs total (Gas 6) Week to Oct 20, 2023: 6 rigs total (Gas 6) Week to Oct 27, 2023: 5 rigs total (Gas 5) Week to Nov 3, 2023: 5 rigs total (Gas 5) Week to Nov 10, 2023: 5 rigs total (Gas 5) Week to Nov 17, 2023: 6 rigs total (Gas 6) Week to Nov 22, 2023: 6 rigs total (Gas 6) Week to Dec 1, 2023: 6 rigs total (Gas 6) Week to Dec 8, 2023: 6 rigs total (Gas 6) Week to Dec 15, 2023: 6 rigs total (Gas 6) Week to Dec 21, 2023: 5 rigs total (Gas 5) Week to Dec 29, 2023: 5 rigs total (Gas 5) Week to Jan 5, 2024: 5 rigs total (Gas 5) Week to Jan 12, 2024: 5 rigs total (Gas 5) Week to Jan 19, 2024: 7 rigs total (Gas 7) Week to Jan 26, 2024: 7 rigs total (Gas 7) Week to Feb 2, 2024: 8 rigs total (Gas 8) Week to Feb 9, 2024: 9 rigs total (Gas 9) Week to Feb 16, 2024: 8 rigs total (Gas 8) Week to Feb 23, 2024: 6 rigs total (Gas 6) Week to Mar 1, 2024: 6 rigs total (Gas 6) Week to Mar 8, 2024: 7 rigs total (Gas 7) Week to Mar 15, 2024: 7 rigs total (Gas 7) Week to Mar 22, 2024: 7 rigs total (Gas 7) Week to Mar 28, 2024: 7 rigs total (Gas 7) Week to Apr 5, 2024: 6 rigs total (Gas 6) Week to Apr 12, 2024: 6 rigs total (Gas 6) Week to Apr 19, 2024: 6 rigs total (Gas 6) Week to Apr 26, 2024: 5 rigs total (Gas 5) Week to May 3, 2024: 4 rigs total (Gas 4) Week to May 10, 2024: 4 rigs total (Gas 4) Week to May 17, 2024: 3 rigs total (Gas 3) Week to May 24, 2024: 3 rigs total (Gas 3) Week to May 31, 2024: 3 rigs total (Gas 3) Week to Jun 7, 2024: 3 rigs total (Gas 3) Week to Jun 14, 2024: 3 rigs total (Gas 3) Week to Jun 21, 2024: 3 rigs total (Gas 3) Week to Jun 28, 2024: 3 rigs total (Gas 3) Week to Jul 5, 2024: 3 rigs total (Gas 3) Week to Jul 12, 2024: 3 rigs total (Gas 3) Week to Jul 19, 2024: 3 rigs total (Gas 3) Week to Jul 26, 2024: 3 rigs total (Gas 3) Week to Aug 2, 2024: 3 rigs total (Gas 3) Week to Aug 9, 2024: 2 rigs total (Gas 2) Week to Aug 16, 2024: 2 rigs total (Gas 2) Week to Aug 23, 2024: 2 rigs total (Gas 2) Week to Aug 30, 2024: 2 rigs total (Gas 2) Week to Sep 6, 2024: 2 rigs total (Gas 2) Week to Sep 13, 2024: 2 rigs total (Gas 2) Week to Sep 20, 2024: 2 rigs total (Gas 2) Week to Sep 27, 2024: 2 rigs total (Gas 2) Week to Oct 4, 2024: 2 rigs total (Gas 2) Week to Oct 11, 2024: 3 rigs total (Gas 3) Week to Oct 18, 2024: 3 rigs total (Gas 3) Week to Oct 25, 2024: 3 rigs total (Gas 3) Week to Nov 1, 2024: 3 rigs total (Gas 3) Week to Nov 8, 2024: 2 rigs total (Gas 2) Week to Nov 15, 2024: 2 rigs total (Gas 2) Week to Nov 22, 2024: 2 rigs total (Gas 2) Week to Nov 27, 2024: 2 rigs total (Gas 2) Week to Dec 6, 2024: 2 rigs total (Gas 2) Week to Dec 13, 2024: 2 rigs total (Gas 2) Week to Dec 20, 2024: 3 rigs total (Gas 3) Week to Dec 27, 2024: 3 rigs total (Gas 3) Week to Jan 3, 2025: 3 rigs total (Gas 3) Week to Jan 10, 2025: 3 rigs total (Gas 3) Week to Jan 17, 2025: 3 rigs total (Gas 3) Week to Jan 24, 2025: 2 rigs total (Gas 2) Week to Jan 31, 2025: 3 rigs total (Gas 3) Week to Feb 7, 2025: 3 rigs total (Gas 3) Week to Feb 14, 2025: 3 rigs total (Gas 3) Week to Feb 21, 2025: 3 rigs total (Gas 3) Week to Feb 28, 2025: 3 rigs total (Gas 3) Week to Mar 7, 2025: 2 rigs total (Gas 2) Week to Mar 14, 2025: 2 rigs total (Gas 2) Week to Mar 21, 2025: 2 rigs total (Gas 2) Week to Mar 28, 2025: 2 rigs total (Gas 2) Week to Apr 4, 2025: 2 rigs total (Gas 2) Week to Apr 11, 2025: 1 rig total (Gas 1) Week to Apr 17, 2025: 2 rigs total (Gas 2) Week to Apr 25, 2025: 1 rig total (Gas 1) Week to May 2, 2025: 1 rig total (Gas 1) Week to May 9, 2025: 1 rig total (Gas 1) Week to May 16, 2025: 1 rig total (Gas 1) Week to May 23, 2025: 1 rig total (Gas 1) Week to May 30, 2025: 1 rig total (Gas 1) Week to Jun 6, 2025: 1 rig total (Gas 1) Week to Jun 13, 2025: 1 rig total (Gas 1) Week to Jun 20, 2025: 2 rigs total (Gas 2) Week to Jun 27, 2025: 2 rigs total (Gas 2) Week to Jul 3, 2025: 2 rigs total (Gas 2) Week to Jul 11, 2025: 2 rigs total (Gas 2) Week to Jul 18, 2025: 2 rigs total (Gas 2) Week to Jul 25, 2025: 2 rigs total (Gas 2) Week to Aug 1, 2025: 2 rigs total (Gas 2) Week to Aug 8, 2025: 2 rigs total (Gas 2) Week to Aug 15, 2025: 2 rigs total (Gas 2) Week to Aug 22, 2025: 3 rigs total (Gas 3) Week to Aug 29, 2025: 3 rigs total (Gas 3) Week to Sep 5, 2025: 3 rigs total (Gas 3) Week to Sep 12, 2025: 3 rigs total (Gas 3) Week to Sep 19, 2025: 3 rigs total (Gas 3) Week to Sep 26, 2025: 4 rigs total (Gas 4) Week to Oct 3, 2025: 4 rigs total (Gas 4) Week to Oct 10, 2025: 4 rigs total (Gas 4) Week to Oct 17, 2025: 3 rigs total (Gas 3) Week to Oct 24, 2025: 3 rigs total (Gas 3) Week to Oct 31, 2025: 5 rigs total (Gas 5) Week to Nov 6, 2025: 5 rigs total (Gas 5) Week to Nov 14, 2025: 5 rigs total (Gas 5) Week to Nov 21, 2025: 5 rigs total (Gas 5) Week to Nov 26, 2025: 5 rigs total (Gas 5) Week to Dec 4, 2025: 5 rigs total (Gas 5) Week to Dec 12, 2025: 5 rigs total (Gas 5) Week to Dec 19, 2025: 3 rigs total (Gas 3) Week to Dec 24, 2025: 3 rigs total (Gas 3) Week to Dec 30, 2025: 3 rigs total (Gas 3) Week to Jan 9, 2026: 2 rigs total (Gas 2) Week to Jan 16, 2026: 3 rigs total (Gas 3) Week to Jan 23, 2026: 2 rigs total (Gas 2) Week to Jan 30, 2026: 3 rigs total (Gas 3) Week to Feb 6, 2026: 3 rigs total (Gas 3) Week to Feb 13, 2026: 3 rigs total (Gas 3) Week to Feb 20, 2026: 3 rigs total (Gas 3) Week to Feb 27, 2026: 3 rigs total (Gas 3) Week to Mar 6, 2026: 3 rigs total (Gas 3) Week to Mar 13, 2026: 3 rigs total (Gas 3) Week to Mar 20, 2026: 3 rigs total (Gas 3) Week to Mar 27, 2026: 4 rigs total (Gas 4) Week to Apr 2, 2026: 5 rigs total (Gas 5) Week to Apr 10, 2026: 5 rigs total (Gas 5) Week to Apr 17, 2026: 5 rigs total (Gas 5) Week to Apr 24, 2026: 5 rigs total (Gas 5) Week to May 1, 2026: 6 rigs total (Gas 6) Week to May 8, 2026: 6 rigs total (Gas 6) Week to May 15, 2026: 6 rigs total (Gas 6) Week to May 22, 2026: 6 rigs total (Gas 6) Week to May 29, 2026: 6 rigs total (Gas 6) Week to Jun 5, 2026: 6 rigs total (Gas 6) Week to Jun 12, 2026: 6 rigs total (Gas 6) Week to Jun 18, 2026: 5 rigs total (Gas 5) Week to Jun 26, 2026: 5 rigs total (Gas 5) Week to Jul 2, 2026: 5 rigs total (Gas 5) Week to Jul 10, 2026: 5 rigs total (Gas 5) Week to Jul 17, 2026: 4 rigs total (Gas 4) Week to Jul 24, 2026: 3 rigs total (Gas 3) Week to Jul 31, 2026: 3 rigs total (Gas 3) Week to Aug 7, 2026: 2 rigs total (Gas 2) Week to Aug 14, 2026: 2 rigs total (Gas 2) Week to Aug 21, 2026: 3 rigs total (Gas 3) Week to Aug 28, 2026: 2 rigs total (Gas 2) Week to Sep 4, 2026: 2 rigs total (Gas 2) Week to Sep 11, 2026: 3 rigs total (Gas 3)

Interactive chart. Focus it and use the left and right arrow keys to read each week, Page Up and Page Down to move a year, Home and End for the ends of the series. The full figures are also in the table below.

  • In Red River Parish, Louisiana, 3 drilling rigs were active in the week to September 11, 2026 (unchanged from a year earlier).
  • Since Sep 2016, the weekly count peaked at 11 in Feb 2023.
  • The count covers land and inland-water rigs; rigs in US federal offshore waters are counted on the Gulf of Mexico page.
Average active rigs per month: full table
Month Gas-directedAll rigs
Sep 2026 (through September 11, 2026)33
Aug 20262.22.2
Jul 20263.83.8
Jun 20265.45.4
May 202666
Apr 20265.25.2
Mar 20263.63.6
Feb 202633
Jan 20262.52.5
Dec 20253.83.8
Nov 202555
Oct 20253.83.8
Sep 20253.43.4
Aug 20252.52.5
Jul 202522
Jun 20251.61.6
May 202511
Apr 20251.21.2
Mar 202522
Feb 202533
Jan 20252.82.8
Dec 20242.62.6
Nov 202422
Oct 202433

Source: CommoVision (commovision.com)

What we cover here

Each row names the grain a region’s production is held at. Where a source publishes at a coarser grain, the page says so.

DataGrainSinceBenchmark
Louisiana production well 1977-01 ~97–98% of EIA

Benchmark cells compare our series with the EIA’s published estimates.

About the EIA comparison

The two are produced differently: the EIA estimates from a survey of the largest operators and a model built to anticipate late filings, while the series compared here are rebuilt from the source’s own records as they arrive. Recent months can differ without either being wrong; the methodology page explains both methods.

Coverage rows for Red River Parish, Louisiana are regenerated at every build from the same catalog of sources the data is built from.

What the data shows

  • Red River Parish, Louisiana produced 15 Mbbl (thousand barrels) of oil and 519.4 Bcf of natural gas in 2025.
  • Red River Parish, Louisiana gas production peaked in 2023 at 588.2 Bcf; 2025 output of 519.4 Bcf ran at 88% of that peak.
  • 889 producing wells tracked, 12 months to May 2026.

Get early access

Watch supply move as soon as its sources publish, with forecasts on 1.1+ million producing wells. The portal, an API and MCP access for AI tools open on October 1, 2026.

Data use is subject to our Terms of Service.